GuideAugust 9, 2026

How to Look Up Building Permits in Seattle

How to search Seattle's permit portal and why older permits don't appear in results. BuildVue shows every permit at an address in one place.

Every project in this article is on the live map.

Building permits in Seattle are public record. The place to look one up is the Seattle Services Portal at services.seattle.gov. The portal searches construction and land use permit records by address or by record number, and it needs no account or login. This guide walks through that search the way the city built it, including one required field that quietly hides older results. It then covers where permit history from before the portal lives, and how the same records look once BuildVue groups them into projects.

This is a guide to finding the records at one address in a single sitting. It also covers finding the record behind one permit number. Watching permit activity across the city month after month is a different job, and how to track building permits in Seattle covers that one. Seattle also works differently from its neighbors, so Bellevue, Tacoma and Everett each have their own walkthrough.

What to have ready before you search

Any one of these is enough to start a search.

  • A record number, if you already have one from a posted notice or an earlier search. Most look like a run of seven digits followed by a letter code for the permit type, such as CN for construction or LU for land use. Applications still in intake often carry a temporary number instead. It starts with the year, in the form 26TMP followed by six digits.
  • A street address, which the portal asks for in parts rather than as one line of text. Separate fields hold the house number range, the direction in front of the street name, the street name itself, the street type such as AVE or ST, and the direction after the name.
  • A date range, which the portal treats as a required field and fills in for you.

That last one is the piece people miss. The date range is not a filter you add, and it is already on when the page loads.

How to run the search

Go to services.seattle.gov and open Permits for Trade, Construction and Land Use from the list of record types. The page that loads is called Find Trade, Construction and Land Use Permit Records. You do not need to sign in. The Login and Register links sit at the top of the page, but they matter only if you are applying for a permit or paying a fee.

The form is in two halves. Required Fields holds a Create Date From and a Create Date To. Optional Fields holds the record number, the record type, the record status and the address fields. Fill in whichever optional fields you have and leave the rest blank.

Before you press Search, look at the two dates. When we ran this search on August 9, 2026, the portal had prefilled the range as January 1, 2015 through that same day. Anything created before 2015 fell outside the window. Those records would not have come back no matter how well the address matched. If you are looking for a permit filed more than about ten years ago, widen the From date first.

A search with only a street name and a street type matches every property on that street. On a long street that means hundreds of records. The results counter stops giving an exact number once it passes 250 and shows 250 plus instead. Narrowing by house number range, by record type or by a tighter date window turns that into a readable list.

What the results tell you

Results come back as a table with a row for each record and these columns.

  • Created Date, the day the record was opened
  • Record Number, the identifier you can search by directly later
  • Record Type, such as Construction Permit, Master Use Permit or Demolition Permit
  • Status, the stage the record is on
  • Address
  • Description, the free text summary of the work
  • Expiration Date, on the permit types that carry one

A Download Results link sits above the table. It helps when a search returns more rows than you want to read on screen.

Statuses are worth reading carefully. They describe where a record sits inside the city's process rather than what is happening on the ground. A permit can be issued months before anyone breaks ground, and a record can sit still while the applicant redraws something.

Reviews In Process means staff are working through the plans. Additional Info Requested means the city has asked the applicant for something and the clock is with them. Issued means the permit is approved and work is allowed to start. Completed means the record is closed out. A record can also be withdrawn or expired if it never went the whole way through.

Click any row to open the record itself. It repeats the header information and adds the location details, the fees, the inspections and any related records.

NEWSLETTER

Get a monthly newsletter with new features plus Seattle Metro construction activity. No spam.

Permit history from before the portal

The portal carries records from 2005 onward, and it says so on the search page. For anything older, the city keeps a separate archive called Permit and Property Records at web.seattle.gov/dpd/edms. It has two search boxes, one for a record number and one for a street address in Seattle. The archive reaches back into scanned paper files, approval letters and old plan sets.

If a search comes back empty and you are sure work happened at the address, check the date range in the portal first. The archive is the second place to look.

How the same permits show up on BuildVue

One development in Seattle does not produce one permit. It produces a land use permit for the zoning approval, a demolition permit for whatever was on the site, a construction permit for the building itself, and a run of mechanical, electrical and revision records after that. In the portal each of those is its own row with its own number. Putting them back together is work you do by hand.

BuildVue does that matching for you. On the Seattle page, every permit at one address is folded into a single project. Each project carries one stage drawn from where its permits stand, either Design Review, Land Use, Construction or Complete. It also carries a timeline that lines up the application, issue and completion dates across every permit attached to it. BuildVue covers development projects rather than every permit a city issues, so what you see is the pipeline of new buildings rather than the full record of a street.

Projects can be browsed by neighborhood. They can also be opened on the map and filtered by stage, project type and value. For a wider view of the options, including the ones that have nothing to do with permit portals, see ways to track construction projects in the Seattle metro area.

WHY BUILDVUE

See the projects behind this article

BuildVue tracks development permits across two dozen cities around Puget Sound. Every project in this article is on the live map with its full permit history.

What the paid plans include
  • Full project details. Contacts, sales history, the building program, and the full permit record.
  • Alerts. Daily email alerts for followed projects and saved searches.
  • Portfolios. Every past and current project from each developer and architect.
  • Trends. Market statistics and neighborhood totals.
  • Exports. Any filtered list as a spreadsheet.
  • Assistant. Answers about the data in plain words.

Plans start at $29 a month. Every account begins with a free 14 day trial of Pro. No card needed.

Frequently asked questions

Do you need an account to look up a building permit in Seattle?

No. The permit record search on the Seattle Services Portal loaded and ran without a login when we checked. An account is only needed to apply for a permit, upload documents or pay a fee.

Why does a Seattle permit search return nothing for an address you know has had work done?

The most common reason is the date range. The Create Date fields are required and come prefilled, so a record created before the From date will not appear. Widen the From date and search again. If it still returns nothing, the record may predate 2005. That is where the separate Permit and Property Records archive comes in.

How do you find Seattle permit records older than 2005?

Use SDCI's Permit and Property Records archive at web.seattle.gov/dpd/edms. It searches by record number or by street address and holds the scanned historical files. The portal itself points there for older history.

Why does one Seattle address have several different permit numbers?

Because the city issues a separate permit for each kind of work. A single new building normally has a master use permit, a demolition permit, a construction permit and several trade permits. Each one carries its own number and its own status. That is why BuildVue groups every permit at an address into one project instead of showing them one record at a time.

Who do you contact when a permit record does not look right?

Call the city's general permit process line at 206-684-8600. That is the same number to use if a status on a record does not match what you expected to see.

Tags

permitsseattleguidehow-to

Related