Construction projects in Evergreen Hill, Kirkland
4 PROJECTS · 4 ACTIVE
4
Projects
4
Active
None listed
Residential units
None listed
Est. value
None listed
Avg. stories
Area map
4 LOCATIONSProject status
4 STAGEDUnder Construction4100%
What’s being built · 4 active
Residential
3 projects
Commercial
1 project
Filings by year
CURRENT PIPELINE · BY FIRST-FILED YEARolder filings leave tracking as projects complete
Recent activity
LATEST PROJECTS13317 NE 133rd St
Under ConstructionResidential
KC Housing Auth - Building 19 draft stop install: Install 3 draft stops into attic space of building 19. To be 30min fire rated due to the pre-existing fire suppression system in the attic spaces.
Dec 2024
13216 135th Ave NE
Under ConstructionResidential
[2020 NEC] KIRKLAND HEIGHTS BLD 27(EMF24-01868)-Changing the location of solar inverter. (1)Feeder
Nov 2024
13228 135th Ave NE
Under ConstructionResidential
[2020 NEC] KIRKLAND HEIGHTS BLD 26(EMF24-01871)-Just changing the location of solar inverter. Solar installation is complete and the finale inspection was done. (1)Feeder
Nov 2024
14210 132nd Ave NE
Under ConstructionCommercial
St Katherine Church Post Sign: removing old post signs and installing new single-sided sign parallel to the road.
Mar 2024
Nearby neighborhoods
Explore all Evergreen Hill projects on the map
Use BuildVue's interactive map to filter and track construction projects in Evergreen Hill and across Kirkland.